top of page

C.E. MECH Completes Installation of 100 kW Solar Power System at Rayong Facility

  • Writer: Tuwanon Wongtree
    Tuwanon Wongtree
  • Oct 12
  • 1 min read

C.E. MECH Engineering is pleased to announce the successful installation of a 100 kW solar cell system at our Rayong factory. This marks a major step forward in our commitment to integrating clean energy solutions into our operations.


The new solar power system enables the facility to generate clean electricity on-site, reducing reliance on grid-supplied energy and lowering our overall environmental footprint. As our first solar initiative, the Rayong installation serves as an important foundation for our long-term sustainability strategy.


Building on this achievement, C.E. MECH Engineering plans to expand solar capacity across additional facilities in the near future, reinforcing our dedication to energy efficiency, operational resilience, and sustainable growth.


ree

Comments


ISO 9001_UKAS.png

C.E.MECH ENGINEERING CO.,LTD.

128/780 Moo 1, Bang Sao Thong Subdistrict, Bang Sao Thong District, Samut Prakan 10570

Contact

Telephone

Fax

(+66)2-706-6105

E-mail

COPYRIGHT © C.E. MECH ENGINEERING CO., LTD. ALL RIGHTS RESERVED.

bottom of page